Shipping Information

Orders are delivered to the specified shipping address by the following courier services:

  • GLS Courier Service

  • MPL (Hungarian Post)

Processing and Dispatch

  • Received orders are typically processed within 1 business day.

  • After dispatch, delivery is carried out by the selected courier service.

Delivery Time

After dispatch, delivery is expected to be:

  • GLS (1–3), MPL (5-8) business days within Hungary.

The stated duration is for information purposes only. Delivery may be delayed during holidays, peak periods (e.g., year-end), weather or logistical reasons.

Package Tracking

The courier service will notify you of the package status and delivery details at the provided contact information.

For GLS shipments, the package status can be tracked in the GLS system:
https://ecsomag.hu/hu

The package number is provided and managed by the courier service.

Shipping Fees

The shipping fee is calculated and displayed during checkout at the time of order placement.

  • GLS: 1990 HUF

  • MPL: 2480 HUF

Receipt and Inspection

Please check the package upon receipt.

  • In case of damaged packaging, request a report from the courier if possible.

  • If the package is damaged or incomplete, please notify us within 24 hours (with attached photo).

Incorrect Address Data

The accuracy of the shipping address is the responsibility of the customer. In case of incorrect or incomplete address data, delivery may fail or be delayed, and re-delivery may incur additional costs.

Peak Periods

During peak periods (e.g., holidays), courier services may operate with different delivery deadlines, which will be communicated in the webshop or through separate notifications.


PZIOT-E02 consumption meter – with native okosvillanyora.hu support

PZIOT-E02 consumption meter – with native okosvillanyora.hu support

2025.10.16.    513

The Swiss army knife of phase measurement The PZIOT-E02 can provide great help in two situations: 1. If you don’t have an electricity meter with a P1 port In this case, the PZIOT-E02 functions as a…

More
Why is it important to also measure inverter production?

Why is it important to also measure inverter production?

2025.10.16.    430

For owners of household-scale small power plants (HMKE), it is natural to monitor the feedback to the grid. This value shows how much of the produced energy the house does not use immediately, but sen…

More
More than a thousand households already use the Hungarian-developed ADA P1 Meter for more conscious energy use

More than a thousand households already use the Hungarian-developed ADA P1 Meter for more conscious energy use

2025.12.22.    558

In recent times, it has become increasingly important for more Hungarian households not only to see their electricity bill but also to understand what is actually happening behind the scenes. The Debr…

More

Featured

ADA P1 Meter - smart meter for electricity meter +15 cm RJ12 data cable

ADA P1 Meter - smart meter for electricity meter +15 cm RJ12 data cable

The device collects nearly 40 data points (consumption, feedback, phase parameters, reactive energie..

15,900 Forint Ex Tax: 12,520 Forint

PZIOT-E02 – with native okosvillanyora.hu and hmke.app support

PZIOT-E02 – with native okosvillanyora.hu and hmke.app support

The PZIOT-E02 is a compact, DIN rail mountable consumption meter, capable of accurately measuring th..

9,900 Forint 12,899 Forint Ex Tax: 7,795 Forint

3pcs 1-phase PZIOT-E02 current meter – native okosvillanyora.hu support

3pcs 1-phase PZIOT-E02 current meter – native okosvillanyora.hu support

The package contains 3 pieces of PZIOT-E02 phase meters. The above price applies to 3 pcs.The PZIOT-..

24,900 Forint 29,900 Forint Ex Tax: 19,606 Forint

ADA P1 Bridge - Bridge for P1 reader +1m USB cable

ADA P1 Bridge - Bridge for P1 reader +1m USB cable

Compatible with any P1 meter that provides telegram/P1 data on the local network via HTTP GET (URL) ..

5,900 Forint Ex Tax: 4,646 Forint

Comments

No comments yet. Be the first!